Zolder Bridge

Arch Bridge - Heusden-Zolder (Belgium)

Arch Bridge crossing the Albert Canal

Assignment:

Engineering study

State:

Completed (2016)

Contractor:

Iemants Steel Constructions

Design:

NP-BRIDGING

Length :

123 m

Weight:

1250 ton

Heigth:

22.5 m

◄ back to projects

1

2

3

4

5

6